Written from auto-captions with no speaker labels. After minutes were approved, NCDOT Division 9 Traffic Engineer Ryan Newcomb and Deputy Division Engineer Mazie Tucker (captioned spelling) proposed replacing the traffic signal at Fisher Ferry Street and Holly Hill Road with an all-way stop. The pole-mounted signal cabinet has been struck repeatedly and sits about 2 inches under power lines; fixing it properly would cost roughly $400,000 to $450,000 against a division secondary-signal maintenance budget of about $360,000 a year for all of Davidson County. Counts show volumes no longer meet signal warrants, there were five red-light-running crashes by Holly Hill traffic in 12 months, and an all-way stop would cost under $5,000 and model slightly better. NCDOT promised a press release, message boards two weeks ahead, 48-inch stop signs and flagged stop-ahead signs, and said it would leave the signal equipment in place at first, as it did in Mocksville. Members worried that drivers already treat the road as a racetrack, that the planned Fisher Ferry bridge replacement (held up with the railroad) will make approaches faster, and one resident of the intersection said removing the light would make it worse. No vote was taken. The chair said a street paving update will come in the coming months, and the meeting adjourned (Fisher Ferry and Holly Hill Signal Removal).

Source: auto-caption transcript of the YouTube upload of the August 4, 2026 Transportation Committee.

Issues discussed: Fisher Ferry and Holly Hill Signal Removal

Transcript

These are auto-generated YouTube captions with no speaker labels, so names and numbers are likely misheard.

Transcript

00:06Michael, you need like a clapper.

00:09Like for movies.

00:11Ooh.

00:12And it's like and action.

00:15>> It's like clapper?

00:17>> Yeah.

00:19No, like

00:21>> Or we could get those hands.

00:22>> Ooh, even better.

00:24Those are clappers.

00:27No, like one of these numbers.

00:30>> [laughter]

00:31>> No, that's a hook. You need a hook for

00:33that one, babe.

00:34>> That would be the wrong thing to do.

00:36Didn't I think Kelly used to have a

00:40He had a hook and say

00:42>> Oh, that's fun.

00:51>> [snorts]

01:00>> We are now ready to go if you guys are

01:01ready.

01:02>> All right, I'm going to call the

01:04Transportation Committee meeting to

01:05order. Can I get a motion to approve

01:07minutes?

01:08>> I'll make a motion [snorts] that we

01:10that we approve the minutes.

01:12>> Second.

01:13>> Thank you. Those are approved. We have a

01:15presentation by NCDOT about a stoplight

01:19removal. I want to remind everybody

01:20we're all friends here. We're going to

01:22have a nice chat.

01:24Learn what we need to. Thank you.

01:27>> Good morning. My name is Ryan Newcomb.

01:28I'm the Division 9 Traffic Engineer for

01:30NCDOT Division 9. I'm also here with

01:32Mazie Tucker who's our Deputy Division

01:34Engineer. So, Michael asked us to come

01:38present to you all about a

01:40proposal we had sent to him a few weeks

01:42ago regarding the intersection of Fisher

01:44Ferry Street and Holly Hill Road here in

01:45Thomasville.

01:47Those are SR 2813 and SR 2060.

01:51So, just briefly I have some slides to

01:53kind of give you some background about

01:55how we got here.

01:56So, this intersection um has been

01:59signalized for a long time.

02:01Um, if you are familiar with the area,

02:03you probably know that the uh signal

02:05cabinet is pole mounted

02:07uh and has been struck uh by vehicles on

02:09several occasions.

02:10Um, it's currently uh in a state of uh

02:13somewhat disrepair and needs to be uh

02:16replaced.

02:17Um, and that's what sort of started

02:19driving this conversation. Um,

02:21so uh as my staff brought this issue to

02:24my attention, I um you know, started

02:26looking into what it would take for us

02:27to get this cabinet off of the pole and

02:30get it ground mounted uh away from

02:32traffic. Um, some of the things that

02:34we've identified at this location is

02:36that uh right-of-way is limited. Um, it

02:38looks like on the tax map that we are

02:40are pretty pretty tight. Uh, generally

02:42speaking, where the uh utility poles are

02:44located generally serves as the

02:46right-of-way line, so

02:47uh you can see how close they are to the

02:49pavement, uh which would give you an

02:50indication that uh in order to resolve

02:53this, we'd probably have to acquire some

02:54sort of right-of-way or easement uh from

02:56the one of the adjacent properties.

02:58Um, the other things we've identified

03:00here is that the exist existing single

03:02span uh is currently too close uh to uh

03:06the existing overhead power. Uh, there

03:09Duke Energy other power utilities have a

03:12standard uh separation from their

03:14neutral lines uh that's supposed to be

03:1630 in away. Right now, we're mounted um

03:19about 2 in underneath it along with the

03:21other communication facilities that uh

03:24ride on the same pole line.

03:26And uh like a lot of intersections, um

03:28you know, it's been a long time since

03:30this one was re-re-rewired, rebuilt.

03:33Um, and so it could probably use a

03:35complete overhaul.

03:37So as we started uh pricing those

03:39things, and in this photo, you can see

03:41uh how close we are to the power

03:43attachments.

03:44Um,

03:45to just acquire a corner clip that would

03:47be wide enough to get a uh a cabinet

03:51ground mounted, um,

03:53talking with our project development

03:55team, our right-of-way unit, um, we put

03:57a placeholder there $15,000. It's not a

03:59lot of square footage, but should we run

04:01into a property owner that doesn't want

04:03to negotiate or we have to get an

04:05appraisal done, uh, you know, or heaven

04:08forbid file a condemnation, uh, just for

04:10a small clip, um, we put a buffer in

04:12there for that. Uh, the big ticket item

04:15is the utility relocations to get taller

04:17poles put in on two corners. Uh, you

04:19have to go back down the line from the

04:21intersection. Uh, those poles, uh, the

04:24height that we would need, uh, generally

04:26run in the 40 to 50,000 dollars per, uh,

04:29pole range. And so, uh, that would be a

04:32a heavy expense to try to get the

04:34utilities, uh, elevated here.

04:36Uh, we would need some engineering work,

04:38uh, for both the survey of the

04:40right-of-way acquisition and then

04:42updating the signal plan. And then

04:44rewiring, uh, and ground mounting the

04:46cabinet would be, um, about 130,000

04:49dollars. So, all told, uh, we're looking

04:51at a potential 400 to 450,000 dollar

04:54endeavor, uh, to try to get this cabinet

04:57removed off of the pole, uh, and on the

04:59ground.

05:00So, when I see a number like that,

05:01knowing that my entire budget for

05:04secondary signal maintenance in all of

05:05Davidson County is approximately 360,000

05:08dollars a year, um, I started asking

05:11some more questions and we started, uh,

05:13pulling some more data at this location.

05:16Um, so what we found is that, uh,

05:18average, uh, annual daily traffic

05:20volumes on the approaches, uh, we have

05:22some, uh, count stations in close

05:24proximity to the intersection on both

05:26both routes. Uh, those ADTs, uh, have

05:29declined year by year, uh, you know, for

05:32more than the last 10 years.

05:34We did a turning movement count, uh,

05:36back in November of 2025 when this issue

05:38first arose, um, and based on that

05:41turning movement count, uh, looking at

05:43AM, midday, PM peaks, um, looking at the

05:46full 4-hour and 8-hour warrants for

05:49traffic signals, the current volumes at

05:51this location don't meet the the

05:53warrants for a traffic signal. So, in

05:54other words, in other words, if we

05:56didn't have a signal there today and and

05:58we were asked to analyze this

06:00intersection and consider it,

06:02we wouldn't put a traffic signal there

06:04because it doesn't meet the volume

06:05warrants.

06:07And so, I took the the the volume data

06:09and we modeled the intersection as it

06:12currently is as a traffic signal and

06:14then we considered what it would be like

06:15in an all-way stop condition.

06:18And one of the reasons that I leaned

06:20towards an all-way stop is that in the

06:21last 12 months, we've had and and our

06:26friends here from the police department

06:27can probably attest to this,

06:29we've had five crashes where vehicles on

06:31Holly Hill have actually run the red

06:33indication. And looking at 5 years'

06:36worth of crashes, that pattern has it

06:39carries over from year to year. And so,

06:41one of the ways that we could

06:42potentially curtail that, knowing the

06:45volumes that we have at this location

06:46would be to implement an all-way stop.

06:48It's much more likely that I could avoid

06:51the collision of someone who's not going

06:52to stop at that stop sign if I'm already

06:54at a stop condition versus driving

06:56through on a green indication.

06:59We've also had some left turn same

07:01roadway crashes here

07:02on both streets and so again, an all-way

07:05stop could help curtail those crashes.

07:07Um

07:08So, we feel like it would be a safer

07:10alternative.

07:12And the volumes that we have out there

07:14today, the all-way stop would function

07:16actually slightly better than the signal

07:18currently functions and part of that's

07:20because um

07:22running just minimum green times on your

07:23main lines, when there's not a lot of

07:26traffic there, you're sort of

07:27arbitrarily delaying the side streets.

07:30Whereas, if I pull up to an all-way

07:31stop, there's no one coming on the other

07:33approaches, I I can proceed.

07:35Um and so, here are some numbers that

07:37kind of kind of back that up a little

07:39bit. I've got uh of service grades, uh

07:42you know, A, B, C, and D, um and then

07:44the associated vehicle uh a delay per

07:47vehicle, seconds per vehicle that we we

07:49got from the model. Uh looking at the

07:52existing signal condition today, we see

07:55uh anywhere from, you know, two to even

07:57more than that seconds uh per vehicle

07:58delay improvements, um

08:00particularly on the the westbound Holly

08:02Hill approach, uh where again you're

08:04you're uh stopping that movement, um if

08:07even if there's nobody coming until

08:09the signal gaps out.

08:11So, uh in light of the the fact that uh

08:13it performs a little bit better, um and

08:16then also still with the volumes we see

08:18today, uh the all-way stop would have

08:20some capacity. Uh so, in other words, if

08:22we start to see growth in this area, if

08:25uh things redevelop, uh for instance,

08:27and we start to see traffic pick up, the

08:29all-way stop would still function pretty

08:31well before we would be back in a

08:32situation where signalizing the

08:34intersection might be required.

08:36Um and so, from our vantage point, we

08:38can implement this all-way stop for

08:40probably less than $5,000.

08:42Um and uh that that would include uh

08:45wrecking out uh some of the signal

08:47equipment once the all-way stop is

08:48implemented. So, from a dollars and

08:50cents standpoint, uh as a department, uh

08:53knowing the numbers we see from a

08:54traffic standpoint and how it models, it

08:56just made sense to us uh to go forward

08:59with this. And so, we wanted to present

09:00this information to you, kind of make

09:02you aware of what's uh what we found and

09:04what we've seen, and then try to answer

09:05any questions that you might have.

09:12>> So, thank you for the presentation, but

09:14when a uh change or shift is made in

09:16this kind of area, where it's been uh

09:19traditionally a light for so long, what

09:21kind of procedures are put in place to

09:23help ensure people that just have some

09:25of that muscle memory,

09:26>> Sure.

09:27>> that might not even really realize that,

09:29you know, it's a four-way stop, just

09:30because they've just been here so long.

09:32What what are we putting in place to

09:33ensure that, you know, um we're curbing

09:35some of that?

09:36>> Yeah, absolutely. Good question. So, we

09:37would first off do a press release. We

09:40would put up variable message signs on

09:41each approach probably 2 weeks in

09:43advance to say new traffic pattern

09:45coming. And then when we do a new

09:46implementation like this, we always add

09:49stop ahead signs on each on the

09:50particular on the approaches that you

09:52know are not the main line the main line

09:54that's used to having that green

09:55indication. But we'll do stop aheads on

09:57all approaches. And then you know, your

10:00average stop sign if you were to go

10:01through the the neighborhood, you'd

10:03probably see stop signs that are 30 in

10:05uh maybe a 36-in wide stop sign. When we

10:08do an implementation like this where

10:10we're doing a drastic change, we'd

10:11probably start with our 48-in stop sign.

10:13So, I call them the big boys. So, we'd

10:16put the big boys out there. We'd

10:17probably put 36-in wide stop aheads.

10:20We'd have flags on them as well for the

10:21first month or so of the implementation

10:23just to so that it stares you in the

10:25face when you approach the intersection.

10:29>> I'm not going to be able to speak

10:30intelligently about this, but I'm

10:31remembering conversation

10:34about Fisher Ferry and there are plans

10:36to straighten it out

10:39at some point.

10:41Yes?

10:45Yeah.

10:46But it's not near this. I mean, it's

10:48near it. It's on the same road. But my

10:50concern, and I know this is just going

10:52to happen and it's going to be fine. I'm

10:54concerned and maybe this is something

10:55that our folks our police need to be

10:57aware of. When we straighten that out

10:59and make it a runway to this

11:00intersection

11:02that we're going to have issues

11:05um with people approaching that much

11:07faster without a light. But I just

11:09wanted to

11:10to put that out there

11:12because I don't know when that's going

11:13to happen. I feel like they've been

11:14talking about it for 300 years.

11:16>> Yeah, I'm not sure about the

11:19Okay.

11:24Okay.

11:25>> I think people are going to fly.

11:27>> They already treat it as a racetrack.

11:30>> [laughter]

11:30>> It's going to get worse. Yeah.

11:33>> At least from the city.

11:35>> Okay.

11:37>> Is that part of the bridge replacement

11:39project?

11:39>> that's what it

11:40>> Okay, the bridge replacement project

11:41there. Okay, that's where we I think

11:43we're still

11:44I think we're still facing some

11:45challenges with the railroad if I'm not

11:47mistaken.

11:47>> Classic.

11:48>> Yeah, so

11:50>> [laughter]

11:51>> Shocker there. Um

11:52No, this is on the record here. Um

11:55>> [laughter]

11:55>> So, um yeah, so I'm I'm not sure what

11:57the timeline is, but I don't I don't

11:59believe uh

12:00it may it may be programmed in this

12:02current fiscal year.

12:04Um but, you know, at this point uh my

12:06staff uh you know, we're ready to to

12:09implement this. So, the the silver

12:10lining there would be is that we could

12:12get this condition in place before that

12:14work happens. Uh so, that hopefully

12:16traffic that uses this route regularly

12:17would be used to the always stop

12:19condition. Yeah.

12:22>> I mean, they they already use that area

12:24right there as

12:27a race track.

12:29I mean, my concern is I mean

12:32my concern is that if you put the

12:34four-way stops up there, I mean, they're

12:36not going to stop and somebody's going

12:38to get seriously hurt there. I mean,

12:39there was just a wreck there the other

12:41day

12:42at that intersection.

12:44>> I live at this intersection, and it's

12:47horrible.

12:48And I think that if you remove the stop

12:50light, it's going to get even worse. And

12:52my husband is a police officer in

12:54Thomasville, so

12:57he's already

12:59issued concerns about it as well, so

13:02>> Yeah, so um again, one of the things I

13:04mentioned was that the crash pattern

13:06that we've seen here

13:07um it is actually the things that are

13:10happening there could actually be based

13:12on, you know, the research we have at

13:13the state, could be actually curtailed

13:16by an always stop. Now, whether you have

13:18a red light or you have a stop sign,

13:19there isn't a lot that can be done from

13:21a police officer standpoint or traffic

13:23engineer standpoint about someone who's

13:25going to disregard that traffic control

13:26device. So, we run that risk no matter

13:29what kind of traffic control device we

13:31install there.

13:32But, the pattern we have seen there is

13:34actually from the what we would consider

13:36the minor street approach, the one

13:38that's not getting the green time all

13:39the time, Holly Hill, is is people

13:42running that red light. And and what

13:45happens there is if I'm coming on Fisher

13:46Ferry and I see a green indication, I'm

13:48going through that intersection. And I

13:50don't know that that guy coming down

13:51Holly Hill is not going to stop at his

13:53red, and he's going to plow into me. Um

13:55but, the silver lining there would be if

13:57I've come to a complete stop at a stop

13:59sign, I'm going to look and gauge that

14:01traffic, and potentially have the

14:03ability to avoid that crash. Could

14:05something serious still happen there?

14:06Absolutely.

14:08And that's something that we would

14:09consider,

14:10and that's something we would continue

14:12to observe. We wouldn't wreck the signal

14:14equipment out day one, just so you know.

14:16We implemented one of these in

14:17Mocksville a couple months ago

14:19at their request of the town,

14:21and we left the signal equipment in

14:23place just to make sure that we weren't,

14:25you know, opening a can of worms,

14:27and needed to turn that thing back on.

14:29But, thankfully, that always stopped at

14:31a at a intersection that's actually got

14:32some pretty weird geometry, the way the

14:34legs attach,

14:36has been working very well. And the town

14:38actually informed us last week that they

14:39went ahead and removed the signal

14:41equipment. So,

14:42so we have, you know, seen this in some

14:44other areas within the division where it

14:45just made sense to implement it,

14:48and it's worked.

14:49But, so I certainly understand the

14:51concerns.

14:51>> So, was that something that we're going

14:53to do? We're going to leave it up to see

14:55how it functions.

14:55>> Yeah, we would we would not, you know,

14:57wreck out the equipment day one. Yeah,

14:59definitely.

15:00>> I appreciate you coming and sharing that

15:02with us. It's not something we've always

15:03had in the past, so I appreciate it and

15:06hearing our our thoughts on it.

15:07>> Yep.

15:07>> Yes.

15:08>> Thank you.

15:10>> Thank you.

15:10>> You're welcome.

15:11>> Yep.

15:13All right.

15:14You got any other business?

15:16>> No other old business.

15:19>> Cool. I don't get to transportation

15:20committee very often, so this has been

15:22fun. Thank you for being here. Um I did

15:25talk to Michael and we're going to get

15:26an update in the coming months about

15:28street paving because I know it's going

15:29to look different this year cuz our

15:31budget looks different this year, but

15:33they're working on getting that. It's

15:34not happening right now or pressing, so

15:38we will hear from them later, but I

15:39think that's it. Can I get a motion to

15:41adjourn?

15:42>> Second.

15:43>> So moved.

15:45>> You're not on there.

15:46>> You got two.

15:47>> Um I make a motion that um

15:51we adjourn.

15:52>> Second.

15:53>> All right, we're adjourned.

15:54>> Good day.

15:56>> Let's take a break.

15:58>> [laughter]

16:03>> No, that one is. We're going to go to

16:05buy now.

16:05>> Okay.